Construction Phase
Construction Phase is divided into two steps, which are Construction Step and Acceptance Step. In the Construction Step, contracting based on the Design Documents is done, and the construction of building systems is started and completed under the construction supervision. Appropriate TAB works are also implemented by the contractor. In the Acceptance Step, FPT is completed by the instruction of CA based on the results of TAB works, and then the building systems are handed over to the owner. The roles of CA are to cope with design changes and to verify the appropriateness of construction supervision and construction control, to inspect a process of TAB works, to implement FPT, to plan a schedule of education and training for operation and maintenance staff and to carry it out.